Project No. 10/2026 –
Construction of a Masonry Fence [Wall]
at Maseyu Farm (Segerea, Tanzania)
The Conventual Franciscan Provincial Custody of St. Maximilian M. Kolbe in Tanzania has proposed Developing Self-Sustainability Project No. 10/2026 entitled “Construction of a Masonry Fence at Maseyu Farm,” aimed at the protection of agricultural land located in Segerea, in the Diocese of Dar-es-Salaam, through the construction of a stable and adequate fence [wall].
This project stems from the real need to safeguard the land of Maseyu Farm, where the friars have initiated agricultural activities to support the formation of postulants and the daily life of the Custody. Currently, the land is exposed to the intrusion of animals, particularly cows and goats from local nomadic communities, which use the area for grazing, causing significant damage to crops and cultivated fields.
To address this situation, the construction of a masonry fence [wall] is planned. It will stand approximately two meters [six and a half feet] high, and will be built out of sandcrete blocks. The aim is to prevent animals from getting in and to ensure crop protection. The fence will enclose an area of about seventy acres and will be carried out in stages, based on available resources, until the entire fence [wall] is completed.
The project is part of the Custody’s commitment to develop self-sustainability through agricultural work. The Superiors strongly support this project, which will concretely support initial formation and advance the financial stability of the local Conventual Franciscan presence.
The project is currently being implemented.
Project Information
- Conventual Franciscan Jurisdiction: Provincial Custody of St. Maximilian M. Kolbe in Tanzania
- Country: Tanzania
- Location: Segerea (Diocese of Dar-es-Salaam)
- Type of Project: Developing Self-Sustainability Project
- Date of Proposal: March 2, 2026
- Direct Project Coordinator:
- Friar Yeromini Miku MUNISHI
- Email: tzcustodialexactor@gmail.com
- Expected Duration of the Project:
- Six months from the receipt of the funds
- Total Project Cost:
- €19,333.30
- Local Contributions (from the Custody):
- €2,333.30
- Contribution Requested:
- €17,000.00
Update
– September 2026
Project No. 10/2026 has been fully funded thanks to a €17,000.00 contribution from “Con il Cuore, nel nome di Francesco,” the charity telethon organized by the friars of the Sacred Convent of St. Francis in Assisi. With a local contribution of €2,333.30, the entire projected cost of the project—€19,333.30—has now been covered. The project is currently underway and will gradually complete the fencing being installed around Maseyu Farm, which will protect the agricultural land and crops intended to support the formation of postulants and contribute to the self-sufficiency of the Custody.
Projects Office
Final Report
Project No. 10/2026 – Construction of a Masonry Fence [Wall] at Maseyu Farm was completed on October 30, 2026. The €17,000.00 donation from “Con il Cuore, nel nome di Francesco” was received on July 3, 2026.
Implementation of the Project
During the first phase, local workers produced the blocks needed for construction. This approach helped reduce costs by eliminating the need to purchase blocks from suppliers.
The team then cleared the dense vegetation, including shrubs, to prepare the area for the foundations and create an access route for transporting materials.
The foundations were excavated to a depth and width of approximately 91 centimeters [3 feet]. Given the clay-based nature of the soil, sand was spread in the trenches to promote compaction and water drainage as the ground settled. Concrete was then poured to ensure the structure’s stability and its ability to withstand loads and compressive forces.
Next, blocks were laid for the foundation and walls, and the trenches were backfilled with soil to support the structure and prevent subsidence. The masonry blocks were kept wet for several days to facilitate curing, thereby enhancing the wall’s strength, safety, and durability.
Challenges Encountered
During construction, material prices continued to rise.
The project relied on a single water source: a well equipped with a solar-powered pump. The capacity of the storage tanks proved insufficient to simultaneously meet the needs of both the formation house and the construction site. The final report therefore notes the need to install additional tanks in the future.
Transporting materials to the outlying areas of the farm also presented difficulties due to the presence of shrubs, bushes, and trees. To facilitate the work, it was necessary to cut down some trees.
Results and Beneficiaries
According to the final report, the project’s main benefit is improved security for the friars, postulants, livestock, and crops. The fence prevents intruders from entering and more clearly defines the property boundaries. This increased protection is expected to lead to higher crop yields and the expansion of agricultural and livestock activities.
The direct beneficiaries, whose number may vary from year to year, currently include twenty-three postulants, two formators, and three staff members, for a total of twenty-eight people.
The indirect benefits extend to the entire Provincial Custody of St. Maximilian M. Kolbe in Tanzania. The report estimates that more than 120 people will benefit, including postulants and friars, from the youngest member to the oldest friar.
Projects Office