Project No. 09/2025 –
Completing the Construction of a Hall, Two Classrooms, and Offices
(Lusaka, Zambia)
The Province of the Franciscan Protomartyrs in Zambia of the Order of Friars Minor Conventual has proposed Social-Pastoral Project No. 09/2025, entitled, “Completing the Construction of a Hall, Two Classrooms, and Offices.” The project aims to improve pastoral and educational facilities at the St. Peter parish community on the outskirts of Lusaka.
The St. Peter parish community is a densely populated area, consisting primarily of informal settlements, and lacking an adequate road network. The local population largely belongs to a low-income group that is unable to afford rents in the more developed parts of the city. In this context, the friars are an important source of support and guidance, particularly for young people, who see real hope for the future of the Church and Franciscan spirituality in Zambia.
Currently, the local church is also being used as a classroom to accommodate children who cannot afford private schools. However, the lack of adequate space significantly limits the pastoral, educational, and social activities of the community.
The project involves completing the construction of a hall, two classrooms, and offices, to provide suitable spaces for various activities. The new facilities will make it possible to organize educational meetings for young people and adults, particularly meetings aimed at raising awareness about drug abuse and addiction, which are widespread in the parish.
In addition, the spaces will be used for catechesis for children, which is currently held outdoors in inadequate conditions, as well as for marriage preparation courses and meetings of lay groups. The parish center will also continue to play an important social role, serving as a distribution point for medication for people living with HIV and as a place for periodic healthcare support for children.
The construction of these facilities will significantly strengthen pastoral and community life, offering more dignified and functional conditions for evangelization and service to the local population.
The project was entirely funded by the Province of Our Lady of Consolation in the USA (OLC), which covered the requested contribution, making it possible to launch and develop the project.
The project began on September 1, 2025. It includes the construction of an administrative building and a nursery school, with a total floor space of 388.41 sq m (4,182 sq ft ), of which 198.37 sq m (2,134 sq ft ) is on the ground floor and 190. 04 sq m (2,047 sq ft ) is on the second floor.
To date, several important stages of the work have been completed. The foundations have been excavated and reinforced with concrete and steel; the steel reinforcements have been prepared and the load-bearing structures for the concrete floors and columns have been built; masonry work has been carried out up to the roof level; and finally, the electrical connections for all rooms of the building have been installed.
During this work, several significant difficulties emerged. First, there were adverse weather conditions: the rainy season began early, with heavy and continuous rainfall that, for several days, prevented the regular progress of activities. In addition, there were economic difficulties created by the rising cost of living, which impacted the price of construction materials and caused fluctuations in fuel costs. Finally, there were frequent and prolonged power outages that affected the water supply and the use of machinery.
Due to the difficulties encountered, the project has not yet been completed; therefore, an assessment for additional support is needed. This is currently being studied in collaboration with the Province of Zambia, in order to complete the project.
Project Information
- Conventual Franciscan Jurisdiction: Province of the Franciscan Protomartyrs in Zambia
- Country: Zambia
- Location: Lusaka
- Type of Project: Social-Pastoral project
- Date of Proposal: March 1, 2025
- Start Date: September 1, 2025
- Estimated Duration: Two years
- Direct Project Coordinator:
- Friar Luke Katongo CHILAMBWE
- Total Project Cost: €112,473.27 (ZMW 3,236,980.89)[1]
- Estimated Expenses:
- Masonry and utility installation work: €82,420.47 (ZMW 2,373,060.89)
- Labor: €19,168.51 (ZMW 551,670.00)
- Roofing materials: €10,884.29 (ZMW 313,250.00)
- Local Contributions:
- €82,420.47 (ZMW 2,373,060.89)
- Contribution from the Province of Our Lady of Consolation in the USA (OLC):
- €30,052.81 (ZMW 864,920.00)
Update
– July 2026
During the implementation of this project, several critical issues arose that have significantly impacted both the progress of the work and the overall costs of the project. Although construction began in 2025, and allowed for the completion of the building’s foundations and masonry work, the initial budget proved insufficient due to a series of unforeseen circumstances.
The key factors driving the cost increases include rising prices for construction materials, labor, and fuel, compounded by the sharp devaluation of the Zambian currency, one of the hardest-hit currencies on the African continent over the past year. Added to these difficulties are frequent power outages—sometimes lasting eight hours a day—and a prolonged rainy season, which has repeatedly prevented construction activities from proceeding as scheduled.
To complete the construction of the hall, classrooms, and offices, additional funding of €42,381.00 is needed. Thanks to the generosity of several benefactors, part of this amount has already been secured: the solidarity initiative “Con il Cuore, nel nome di Francesco” contributed €20,000.00, while “Cuore Amico ETS” allocated €10,000.00 toward the project’s completion.
Therefore, €12,381.00 still needs to be raised in order to complete the project and make the new facilities—intended for pastoral, educational, and social activities—fully available to the parish community.
- Amount requested:
- €12,381.00
Update
– September 2026
The remaining funds needed to complete the project were sent by the Province of Our Lady of Consolation in the USA (OLC), totaling $14,165 USD. The funds are currently held at the General Curia and will be sent to the Province of Zambia as soon as the latest contributions have been accounted for.
Projects Office
[1] Conversions into euros were calculated using an approximate average exchange rate for the year 2025 (1 ZMW = €0.0347), consistent with the performance of the currency market during the reference period.





![Project No. 10/2026 – Construction of a Masonry Fence [Wall] prog-10-2026](https://www.ofmconv.net/wp-content/uploads/2026/11/ENG-prog-10-2026-04-26-00-150x150.jpg)